NV65B4FE1T Vertical Pump
Couldn't load pickup availability
Product Description
The NV65B4FE1T Vertical Pump is a high-performance, multi-stage booster pump designed to handle demanding industrial, commercial, and agricultural applications. Its compact, vertical in-line design saves space while delivering exceptional reliability and efficiency.
Equipped with a robust 5 HP single-phase motor, the NV65B4FE1T offers a flow rate of up to 65 GPM and can handle pressures up to 232 PSI. Constructed from premium 304 stainless steel, it provides excellent durability and corrosion resistance, ensuring long-lasting performance in various environments. Maintenance-free cartridge mechanical seals and ANSI standard flanged connections simplify installation and servicing.
Certified to meet NSF/ANSI 61 and 372 standards, this pump is ideal for applications such as reverse osmosis, water boosting, filtration systems, heat exchangers, and hot and cold water circulation. Combining high-quality materials, precision engineering, and versatile functionality, the NV65B4FE1T is an outstanding choice for efficient water handling solutions.
Specifications for NV65B4FE1T Vertical Pump
Specification | Details |
---|---|
Model | NV65B4FE1T |
Motor Power | 5 HP, Single-Phase |
Flow Rate | Up to 65 GPM |
Maximum Pressure | 232 PSI |
Materials |
|
Connections | 2" ANSI 150# Flanged |
Operating Temperature | Up to 248°F |
Certifications | NSF/ANSI 61 and 372 |
Applications |
|
Dimensions |
|
Installation Instructions for NV65B4FE1T Vertical Pump
-
Preparation:
- Inspect the pump and motor for any visible damage during shipping. Report any damage to the carrier or dealer immediately.
- Ensure the installation site is level, stable, and provides adequate space and ventilation for motor cooling and servicing.
- Verify that the pump model matches the system requirements and intended application.
-
Mounting the Pump:
- Secure the pump base to a solid, flat surface to minimize vibrations during operation.
- Align and support the suction and discharge piping to prevent undue strain on the pump.
- Install isolation valves on both the suction and discharge sides for easy maintenance and servicing.
-
Piping Connections:
- Ensure piping matches the pump’s 2" ANSI 150# flanged connections.
- Install appropriate gaskets to prevent leaks and ensure unobstructed flow.
- Remove any protective covers or caps from the flanges before installation.
- For hot water systems, include a bleed valve in the discharge line to relieve pressure during maintenance.
-
Electrical Connection:
- Have a certified electrician verify that the electrical supply matches the motor’s specifications (5 HP, single-phase).
- Ensure proper motor wiring and confirm counterclockwise rotation when viewed from the motor’s rear.
- If rotation is incorrect, consult the motor’s wiring instructions for correction.
-
Priming the Pump:
- Remove the fill plug and use a funnel to fill the pump casing with water.
- Open the vent plug to allow air to escape as the pump fills with water.
- Re-seal the vent plug and fill plug once a steady stream of water flows from the vent.
-
Initial Testing:
- Open the suction valve fully and partially open the discharge valve.
- Apply power to the motor and check for smooth operation without noise or vibration.
- Gradually open the discharge valve to achieve desired operating conditions.
-
Safety Precautions:
- Never operate the pump without water to avoid damage to internal components.
- Replace coupling guards after installation to ensure operator safety.
- Ensure the pump is properly grounded and all connections are secure before starting.
Product Description
The NV65B4FE1T Vertical Pump is a high-performance, multi-stage booster pump designed to handle demanding industrial, commercial, and agricultural applications. Its compact, vertical in-line design saves space while delivering exceptional reliability and efficiency.
Equipped with a robust 5 HP single-phase motor, the NV65B4FE1T offers a flow rate of up to 65 GPM and can handle pressures up to 232 PSI. Constructed from premium 304 stainless steel, it provides excellent durability and corrosion resistance, ensuring long-lasting performance in various environments. Maintenance-free cartridge mechanical seals and ANSI standard flanged connections simplify installation and servicing.
Certified to meet NSF/ANSI 61 and 372 standards, this pump is ideal for applications such as reverse osmosis, water boosting, filtration systems, heat exchangers, and hot and cold water circulation. Combining high-quality materials, precision engineering, and versatile functionality, the NV65B4FE1T is an outstanding choice for efficient water handling solutions.
Specifications for NV65B4FE1T Vertical Pump
Specification | Details |
---|---|
Model | NV65B4FE1T |
Motor Power | 5 HP, Single-Phase |
Flow Rate | Up to 65 GPM |
Maximum Pressure | 232 PSI |
Materials |
|
Connections | 2" ANSI 150# Flanged |
Operating Temperature | Up to 248°F |
Certifications | NSF/ANSI 61 and 372 |
Applications |
|
Dimensions |
|
Installation Instructions for NV65B4FE1T Vertical Pump
-
Preparation:
- Inspect the pump and motor for any visible damage during shipping. Report any damage to the carrier or dealer immediately.
- Ensure the installation site is level, stable, and provides adequate space and ventilation for motor cooling and servicing.
- Verify that the pump model matches the system requirements and intended application.
-
Mounting the Pump:
- Secure the pump base to a solid, flat surface to minimize vibrations during operation.
- Align and support the suction and discharge piping to prevent undue strain on the pump.
- Install isolation valves on both the suction and discharge sides for easy maintenance and servicing.
-
Piping Connections:
- Ensure piping matches the pump’s 2" ANSI 150# flanged connections.
- Install appropriate gaskets to prevent leaks and ensure unobstructed flow.
- Remove any protective covers or caps from the flanges before installation.
- For hot water systems, include a bleed valve in the discharge line to relieve pressure during maintenance.
-
Electrical Connection:
- Have a certified electrician verify that the electrical supply matches the motor’s specifications (5 HP, single-phase).
- Ensure proper motor wiring and confirm counterclockwise rotation when viewed from the motor’s rear.
- If rotation is incorrect, consult the motor’s wiring instructions for correction.
-
Priming the Pump:
- Remove the fill plug and use a funnel to fill the pump casing with water.
- Open the vent plug to allow air to escape as the pump fills with water.
- Re-seal the vent plug and fill plug once a steady stream of water flows from the vent.
-
Initial Testing:
- Open the suction valve fully and partially open the discharge valve.
- Apply power to the motor and check for smooth operation without noise or vibration.
- Gradually open the discharge valve to achieve desired operating conditions.
-
Safety Precautions:
- Never operate the pump without water to avoid damage to internal components.
- Replace coupling guards after installation to ensure operator safety.
- Ensure the pump is properly grounded and all connections are secure before starting.