NV120B3-2FE3T Vertical Pump (10HP)
Couldn't load pickup availability
Product Description
The NV120B3-2FE3T Vertical Pump is a high-capacity, multi-stage booster pump designed to meet the rigorous demands of industrial, commercial, and agricultural applications. Its vertical, in-line design optimizes space usage while delivering exceptional efficiency and reliability.
Featuring a powerful 10 HP, three-phase motor, this pump delivers a flow rate of up to 120 GPM and handles pressures up to 232 PSI. Constructed entirely from 304 stainless steel, it ensures outstanding durability and resistance to corrosion, making it ideal for use in harsh environments. Maintenance-free cartridge mechanical seals and ANSI standard flanged connections simplify installation and maintenance, minimizing downtime.
Certified to meet NSF/ANSI 61 and 372 standards, the NV120B3-2FE3T is well-suited for applications such as reverse osmosis, water boosting, filtration systems, heat exchangers, and hot and cold water circulation. Engineered for high performance and reliability, this pump is a dependable choice for your water handling needs.
Specifications for NV120B3-2FE3T Vertical Pump
Specification | Details |
---|---|
Model | NV120B3-2FE3T |
Motor Power | 10 HP, Three-Phase |
Flow Rate | Up to 120 GPM |
Maximum Pressure | 232 PSI |
Materials |
|
Connections | 3" ANSI 150# Flanged |
Operating Temperature | Up to 248°F |
Certifications | NSF/ANSI 61 and 372 |
Applications |
|
Dimensions |
|
Installation Instructions for NV120B3-2FE3T Vertical Pump
-
Preparation:
- Inspect the pump and motor for visible damage during shipping. Report any issues to the carrier or dealer immediately.
- Ensure the installation site is level, stable, and provides adequate space and ventilation for motor cooling and maintenance.
- Verify that the pump model and motor specifications match the system requirements and application.
-
Mounting the Pump:
- Secure the pump base to a flat, solid surface to minimize vibrations during operation.
- Align and support the suction and discharge piping to prevent excessive strain on the pump.
- Install isolation valves on both the suction and discharge sides for easier servicing and maintenance.
-
Piping Connections:
- Ensure piping matches the pump’s 3" ANSI 150# flanged connections.
- Install gaskets to prevent leaks and ensure proper sealing.
- Remove any protective covers or caps from the flanges before installation.
- Include a bleed valve in the discharge line for hot water systems to relieve pressure during servicing.
-
Electrical Connection:
- Have a certified electrician verify the electrical supply matches the motor’s specifications (10 HP, three-phase).
- Ensure correct motor wiring and confirm counterclockwise rotation when viewed from the motor’s rear.
- If rotation is incorrect, reverse any two leads on a three-phase motor to correct it.
-
Priming the Pump:
- Remove the fill plug and fill the pump casing with water using a funnel.
- Open the vent plug to allow air to escape as the pump fills with water.
- Re-seal the vent and fill plugs once a steady stream of water flows from the vent.
-
Initial Testing:
- Fully open the suction valve and partially open the discharge valve.
- Apply power to the motor and monitor for smooth operation without unusual noise or vibration.
- Gradually open the discharge valve to achieve the desired operating conditions.
-
Safety Precautions:
- Never operate the pump without water to avoid damaging internal components.
- Replace coupling guards after installation to ensure operator safety.
- Ensure the pump is properly grounded and all connections are secure before starting.
Product Description
The NV120B3-2FE3T Vertical Pump is a high-capacity, multi-stage booster pump designed to meet the rigorous demands of industrial, commercial, and agricultural applications. Its vertical, in-line design optimizes space usage while delivering exceptional efficiency and reliability.
Featuring a powerful 10 HP, three-phase motor, this pump delivers a flow rate of up to 120 GPM and handles pressures up to 232 PSI. Constructed entirely from 304 stainless steel, it ensures outstanding durability and resistance to corrosion, making it ideal for use in harsh environments. Maintenance-free cartridge mechanical seals and ANSI standard flanged connections simplify installation and maintenance, minimizing downtime.
Certified to meet NSF/ANSI 61 and 372 standards, the NV120B3-2FE3T is well-suited for applications such as reverse osmosis, water boosting, filtration systems, heat exchangers, and hot and cold water circulation. Engineered for high performance and reliability, this pump is a dependable choice for your water handling needs.
Specifications for NV120B3-2FE3T Vertical Pump
Specification | Details |
---|---|
Model | NV120B3-2FE3T |
Motor Power | 10 HP, Three-Phase |
Flow Rate | Up to 120 GPM |
Maximum Pressure | 232 PSI |
Materials |
|
Connections | 3" ANSI 150# Flanged |
Operating Temperature | Up to 248°F |
Certifications | NSF/ANSI 61 and 372 |
Applications |
|
Dimensions |
|
Installation Instructions for NV120B3-2FE3T Vertical Pump
-
Preparation:
- Inspect the pump and motor for visible damage during shipping. Report any issues to the carrier or dealer immediately.
- Ensure the installation site is level, stable, and provides adequate space and ventilation for motor cooling and maintenance.
- Verify that the pump model and motor specifications match the system requirements and application.
-
Mounting the Pump:
- Secure the pump base to a flat, solid surface to minimize vibrations during operation.
- Align and support the suction and discharge piping to prevent excessive strain on the pump.
- Install isolation valves on both the suction and discharge sides for easier servicing and maintenance.
-
Piping Connections:
- Ensure piping matches the pump’s 3" ANSI 150# flanged connections.
- Install gaskets to prevent leaks and ensure proper sealing.
- Remove any protective covers or caps from the flanges before installation.
- Include a bleed valve in the discharge line for hot water systems to relieve pressure during servicing.
-
Electrical Connection:
- Have a certified electrician verify the electrical supply matches the motor’s specifications (10 HP, three-phase).
- Ensure correct motor wiring and confirm counterclockwise rotation when viewed from the motor’s rear.
- If rotation is incorrect, reverse any two leads on a three-phase motor to correct it.
-
Priming the Pump:
- Remove the fill plug and fill the pump casing with water using a funnel.
- Open the vent plug to allow air to escape as the pump fills with water.
- Re-seal the vent and fill plugs once a steady stream of water flows from the vent.
-
Initial Testing:
- Fully open the suction valve and partially open the discharge valve.
- Apply power to the motor and monitor for smooth operation without unusual noise or vibration.
- Gradually open the discharge valve to achieve the desired operating conditions.
-
Safety Precautions:
- Never operate the pump without water to avoid damaging internal components.
- Replace coupling guards after installation to ensure operator safety.
- Ensure the pump is properly grounded and all connections are secure before starting.