NV12B10FE3T/NV CP 12/10 304SS 2HP/3HP
Couldn't load pickup availability
Product Description
The NV12B10FE3T/NV CP 12/10 Vertical Pump is a robust and high-efficiency multistage booster pump designed for demanding industrial, commercial, and agricultural applications. Built with precision and durability in mind, its compact, in-line design ensures efficient space utilization and reliable performance in a variety of systems.
Featuring a 2 HP or 3 HP motor option, this pump delivers a flow rate of up to 12 GPM and handles pressures up to 362 PSI. Constructed entirely of 304 stainless steel, it offers exceptional corrosion resistance and long service life. Maintenance-free cartridge mechanical seals and ANSI standard flanged connections make installation and servicing simple and efficient.
Certified to meet NSF/ANSI 61 and 372 standards, this pump is ideal for reverse osmosis, water boosting, filtration systems, hot and cold water circulation, and heat exchangers. Its durable construction and high performance make it a trusted choice for a wide range of applications.
Specifications for NV12B10FE3T/NV CP 12/10 Vertical Pump
Specification | Details |
---|---|
Model | NV12B10FE3T / NV CP 12/10 |
Motor Options | 2 HP or 3 HP |
Flow Rate | Up to 12 GPM |
Maximum Pressure | 362 PSI |
Materials |
|
Connections | 2" ANSI 150# Flanged |
Operating Temperature | Up to 248°F |
Certifications | NSF/ANSI 61 and 372 |
Applications |
|
Dimensions |
|
Installation Instructions for NV12B10FE3T/NV CP 12/10 Vertical Pump
-
Preparation:
- Inspect the pump and motor for any visible damage during shipping. Report any damage to the carrier or dealer immediately.
- Ensure the installation site is level, stable, and provides adequate ventilation for motor cooling and servicing.
- Verify that the pump model matches the system requirements and intended application.
-
Mounting the Pump:
- Secure the pump base to a flat, solid surface to minimize vibrations during operation.
- Align and support the suction and discharge piping to prevent undue strain on the pump.
- Install isolation valves on both the suction and discharge sides for easy maintenance and servicing.
-
Piping Connections:
- Ensure piping matches the pump’s 2" ANSI 150# flanged connections.
- Install appropriate gaskets to prevent leaks and ensure unobstructed flow.
- Remove any protective covers or caps from the flanges before installation.
- For hot water systems, include a bleed valve in the discharge line to relieve pressure during maintenance.
-
Electrical Connection:
- Have a certified electrician verify that the electrical supply matches the motor’s specifications (2 HP or 3 HP).
- Ensure proper motor wiring and confirm counterclockwise rotation when viewed from the motor’s rear.
- If rotation is incorrect on a three-phase motor, reverse any two leads to correct it.
-
Priming the Pump:
- Remove the fill plug and use a funnel to fill the pump casing with water.
- Open the vent plug to allow air to escape as the pump fills with water.
- Re-seal the vent plug and fill plug once a steady stream of water flows from the vent.
-
Initial Testing:
- Open the suction valve fully and partially open the discharge valve.
- Apply power to the motor and check for smooth operation without noise or vibration.
- Gradually open the discharge valve to achieve desired operating conditions.
-
Safety Precautions:
- Never operate the pump without water to prevent damage to internal components.
- Replace coupling guards after installation to ensure operator safety.
- Ensure the pump is properly grounded and all connections are secure before starting.
Product Description
The NV12B10FE3T/NV CP 12/10 Vertical Pump is a robust and high-efficiency multistage booster pump designed for demanding industrial, commercial, and agricultural applications. Built with precision and durability in mind, its compact, in-line design ensures efficient space utilization and reliable performance in a variety of systems.
Featuring a 2 HP or 3 HP motor option, this pump delivers a flow rate of up to 12 GPM and handles pressures up to 362 PSI. Constructed entirely of 304 stainless steel, it offers exceptional corrosion resistance and long service life. Maintenance-free cartridge mechanical seals and ANSI standard flanged connections make installation and servicing simple and efficient.
Certified to meet NSF/ANSI 61 and 372 standards, this pump is ideal for reverse osmosis, water boosting, filtration systems, hot and cold water circulation, and heat exchangers. Its durable construction and high performance make it a trusted choice for a wide range of applications.
Specifications for NV12B10FE3T/NV CP 12/10 Vertical Pump
Specification | Details |
---|---|
Model | NV12B10FE3T / NV CP 12/10 |
Motor Options | 2 HP or 3 HP |
Flow Rate | Up to 12 GPM |
Maximum Pressure | 362 PSI |
Materials |
|
Connections | 2" ANSI 150# Flanged |
Operating Temperature | Up to 248°F |
Certifications | NSF/ANSI 61 and 372 |
Applications |
|
Dimensions |
|
Installation Instructions for NV12B10FE3T/NV CP 12/10 Vertical Pump
-
Preparation:
- Inspect the pump and motor for any visible damage during shipping. Report any damage to the carrier or dealer immediately.
- Ensure the installation site is level, stable, and provides adequate ventilation for motor cooling and servicing.
- Verify that the pump model matches the system requirements and intended application.
-
Mounting the Pump:
- Secure the pump base to a flat, solid surface to minimize vibrations during operation.
- Align and support the suction and discharge piping to prevent undue strain on the pump.
- Install isolation valves on both the suction and discharge sides for easy maintenance and servicing.
-
Piping Connections:
- Ensure piping matches the pump’s 2" ANSI 150# flanged connections.
- Install appropriate gaskets to prevent leaks and ensure unobstructed flow.
- Remove any protective covers or caps from the flanges before installation.
- For hot water systems, include a bleed valve in the discharge line to relieve pressure during maintenance.
-
Electrical Connection:
- Have a certified electrician verify that the electrical supply matches the motor’s specifications (2 HP or 3 HP).
- Ensure proper motor wiring and confirm counterclockwise rotation when viewed from the motor’s rear.
- If rotation is incorrect on a three-phase motor, reverse any two leads to correct it.
-
Priming the Pump:
- Remove the fill plug and use a funnel to fill the pump casing with water.
- Open the vent plug to allow air to escape as the pump fills with water.
- Re-seal the vent plug and fill plug once a steady stream of water flows from the vent.
-
Initial Testing:
- Open the suction valve fully and partially open the discharge valve.
- Apply power to the motor and check for smooth operation without noise or vibration.
- Gradually open the discharge valve to achieve desired operating conditions.
-
Safety Precautions:
- Never operate the pump without water to prevent damage to internal components.
- Replace coupling guards after installation to ensure operator safety.
- Ensure the pump is properly grounded and all connections are secure before starting.