NV45B4FE1T Vertical Pump

SKU: CQE-PM-89006
Regular price $6,564.00
Rendering loop-subscriptions

Product Description

The NV45B4FE1T Vertical Pump is a high-performance, stainless steel booster pump designed to meet the rigorous demands of industrial, commercial, and agricultural applications. With its compact, in-line design, this pump is ideal for installations requiring minimal space while delivering exceptional reliability and efficiency.

Featuring a powerful 3 HP motor and a flow capacity of up to 45 GPM, the NV45B4FE1T is built to handle pressures up to 232 PSI. Its 304 stainless steel construction ensures superior durability, corrosion resistance, and a long service life. Equipped with maintenance-free cartridge-type mechanical seals and ANSI standard flanged connections, this pump is easy to install and maintain.

Certified to meet NSF/ANSI 61 and 372 standards, the NV45B4FE1T is well-suited for applications such as reverse osmosis, water boosting, filtration systems, hot and cold water circulation, and sprinkler systems.

Specifications for NV45B4FE1T Vertical Pump

Specification Details
Model NV45B4FE1T
Motor Power 3 HP
Flow Rate Up to 54 GPM
Maximum Pressure 232 PSI
Materials
  • Body: 304 or 316 Stainless Steel
  • Impellers: Stainless Steel
  • Seals: EPDM
Connections ANSI 150# 1.25” Flanged
Motor Enclosure TEFC (Totally Enclosed Fan Cooled)
Design Features
  • In-line, space-saving design with suction and discharge on the same plane
  • Maintenance-free cartridge mechanical seals
Certifications NSF/ANSI 61 and 372
Applications
  • Reverse Osmosis
  • Water Boosting
  • Filtration Systems
  • Hot and Cold Water Circulation
  • Sprinkler Systems

Installation Manual

Installation Instructions for NV45B4FE1T Vertical Pump

  1. Preparation:
    • Inspect the pump and motor for any damage during shipping. Report damage immediately to the carrier or dealer.
    • Ensure the installation site is level, stable, and provides adequate ventilation for service and cooling.
    • Check that the pump model matches the system specifications.
  2. Mounting the Pump:
    • Secure the pump base to a flat, solid surface to prevent vibration during operation.
    • Align and support suction and discharge piping to avoid excessive strain on the pump.
    • Install isolation valves on both the suction and discharge sides to facilitate maintenance.
  3. Piping Connections:
    • Ensure piping matches the pump’s flanged connections (1.25” ANSI 150#).
    • Install gaskets to prevent leaks; ensure they do not restrict flow.
    • Remove protective covers or caps from the flanges before installation.
    • For hot water applications, install a bleed valve to relieve pressure during maintenance.
  4. Electrical Connection:
    • Have a certified electrician verify that the power supply matches the pump’s motor specifications (3 HP, TEFC).
    • Ensure the motor is correctly wired, and check for counterclockwise rotation when viewed from the motor’s rear.
    • For three-phase motors, reverse any two leads if the rotation is incorrect.
  5. Priming the Pump:
    • Remove the fill plug and use a funnel to fill the pump casing with water.
    • Open the vent plug to allow air to escape as the pump fills with water.
    • Re-seal the vent plug and fill plug once a steady stream of water flows from the vent.
  6. Initial Testing:
    • Open the suction valve fully and partially open the discharge valve.
    • Apply power to the motor and check for smooth operation without unusual noise or vibration.
    • Gradually open the discharge valve to the desired operating condition.
  7. Safety Precautions:
    • Never operate the pump without water to prevent damage to internal components.
    • Always replace coupling guards after installation to prevent injuries.
    • Ensure the pump is properly grounded and free of leaks before starting.

Product Description

The NV45B4FE1T Vertical Pump is a high-performance, stainless steel booster pump designed to meet the rigorous demands of industrial, commercial, and agricultural applications. With its compact, in-line design, this pump is ideal for installations requiring minimal space while delivering exceptional reliability and efficiency.

Featuring a powerful 3 HP motor and a flow capacity of up to 45 GPM, the NV45B4FE1T is built to handle pressures up to 232 PSI. Its 304 stainless steel construction ensures superior durability, corrosion resistance, and a long service life. Equipped with maintenance-free cartridge-type mechanical seals and ANSI standard flanged connections, this pump is easy to install and maintain.

Certified to meet NSF/ANSI 61 and 372 standards, the NV45B4FE1T is well-suited for applications such as reverse osmosis, water boosting, filtration systems, hot and cold water circulation, and sprinkler systems.

Specifications for NV45B4FE1T Vertical Pump

Specification Details
Model NV45B4FE1T
Motor Power 3 HP
Flow Rate Up to 54 GPM
Maximum Pressure 232 PSI
Materials
  • Body: 304 or 316 Stainless Steel
  • Impellers: Stainless Steel
  • Seals: EPDM
Connections ANSI 150# 1.25” Flanged
Motor Enclosure TEFC (Totally Enclosed Fan Cooled)
Design Features
  • In-line, space-saving design with suction and discharge on the same plane
  • Maintenance-free cartridge mechanical seals
Certifications NSF/ANSI 61 and 372
Applications
  • Reverse Osmosis
  • Water Boosting
  • Filtration Systems
  • Hot and Cold Water Circulation
  • Sprinkler Systems

Installation Manual

Installation Instructions for NV45B4FE1T Vertical Pump

  1. Preparation:
    • Inspect the pump and motor for any damage during shipping. Report damage immediately to the carrier or dealer.
    • Ensure the installation site is level, stable, and provides adequate ventilation for service and cooling.
    • Check that the pump model matches the system specifications.
  2. Mounting the Pump:
    • Secure the pump base to a flat, solid surface to prevent vibration during operation.
    • Align and support suction and discharge piping to avoid excessive strain on the pump.
    • Install isolation valves on both the suction and discharge sides to facilitate maintenance.
  3. Piping Connections:
    • Ensure piping matches the pump’s flanged connections (1.25” ANSI 150#).
    • Install gaskets to prevent leaks; ensure they do not restrict flow.
    • Remove protective covers or caps from the flanges before installation.
    • For hot water applications, install a bleed valve to relieve pressure during maintenance.
  4. Electrical Connection:
    • Have a certified electrician verify that the power supply matches the pump’s motor specifications (3 HP, TEFC).
    • Ensure the motor is correctly wired, and check for counterclockwise rotation when viewed from the motor’s rear.
    • For three-phase motors, reverse any two leads if the rotation is incorrect.
  5. Priming the Pump:
    • Remove the fill plug and use a funnel to fill the pump casing with water.
    • Open the vent plug to allow air to escape as the pump fills with water.
    • Re-seal the vent plug and fill plug once a steady stream of water flows from the vent.
  6. Initial Testing:
    • Open the suction valve fully and partially open the discharge valve.
    • Apply power to the motor and check for smooth operation without unusual noise or vibration.
    • Gradually open the discharge valve to the desired operating condition.
  7. Safety Precautions:
    • Never operate the pump without water to prevent damage to internal components.
    • Always replace coupling guards after installation to prevent injuries.
    • Ensure the pump is properly grounded and free of leaks before starting.
This is a Sample Product Title
Was $200.00 Now $100.00